Cornwall Fairground Ride
We were called out to a faulty fair ground ride in Cornwall, which needed to be fixed the very next day for a show. A new circuit board loaded with capacitors and resistors made for a very long evening. Needless to say, the soldering and circuitry work succeeded and the fair ground ride was back up and running within 24 hours.
